Key reasons why Kype Muir has been chosen for a wind farm:

  • The site has a suitable wind resource. On-site wind monitoring over the past three years has confirmed this
  • The site and its immediate surroundings are not subject to any landscape, ecology or cultural heritage designations
  • The site has suitable access from the local road network
  • The site is located over 2 km from the closes settlement
  • The site is an adequate distance from residential properties to protect residents from unacceptable noise and shadow flicker effects.
  • The site is located in an area identified by South Lanarkshire Council as being suitable for wind farm development.

Get in touch

We welcome your feedback

Whether you wish to tell us that we have done something really well or that we could have done something better we value your feedback.

It helps us to shape the way we operate and to continually improve our performance. It is very much part of our development with care approach.

Registered office: Inkerman House, St John's Road, Meadowfield, Durham, DH7 8XL

Registered in England number 2267400. VAT registration number 569 3236 14

© 2017 Banks Group. All rights reserved.