Local Authority: Lancaster City Council
Postcode of nearby property: LA3 3JU
Site status: Operational
Number of turbines: 3
Height of turbines: 125m
Electricity generated: Up to 2.5MW per turbine. 7.5MW in total
Lifespan of wind farm: 25 years plus 24 months for construction and decommissioning
History: Heysham South Wind Farm consists of three 125 metre-to-tip turbines supplied by Nordex. Cheetham Hill Construction began the construction of the site in August 2014. All three turbines have been fully operational and generating clean electricity since April 2015.

Get in touch

We welcome your feedback

Whether you wish to tell us that we have done something really well or that we could have done something better we value your feedback.

It helps us to shape the way we operate and to continually improve our performance. It is very much part of our development with care approach.

Registered office: Inkerman House, St John's Road, Meadowfield, Durham, DH7 8XL

Registered in England number 2267400. VAT registration number 569 3236 14

© 2018 Banks Group. All rights reserved.