Highthorn Planning Application documents

Environmental Statement

Non Technical Summary

Appendix 1 – Statement of Community Involvement

STATEMENT OF COMMUNITY INVOLVEMENT

Church of England Academy site visit presentation

Comments to media queries

Example of parish council presentation

Enhancing your landscape leaflet

Example of site visit feedback form

Exhibition Feedback Form

Exhibition Newsletter September 2015

Exhibition Feedback Form

Exhibition Newsletter September 2015

Exhibition Panels September 2015

Highthorn update letter July 2014

Highthorn update letter Oct 2013

Launch newsletter

Appendix 2 – LVIA

Appendix 2 – Landscape & Visual Impact_Landscape

HJB_BA795_145_Viewpoint Location Plan-A3 Layout

HJB_BA795_146_ZTV Information Plan-A3 Sheet 1 to 3

HJBBA795141_Visualisation StudyVP1toVP21

Appendix 3 – Ecology Assessment

Appendix 3.1 – Ecological Assessment

Appendix 3.2 – Mammal Survey

Appendix 3.3 – Bat Survey

Appendix 3.4 – Bird Surveys

Appendix 3.5 Cover Sheet

Appendix 3.6 – Amphibian Survey

Appendix 3.7 Hedgerow Survey

Appendix 3.8 – Tree Report

Phase 1 Habitat Plan

Appendix 4 – Archaeological Assessment

Appendix 4 – Archaeological Assessment

Appendix 4 – Geophys Assessment

Appendix 4 – Signifance Report

Appendix 5 – Hydrological Assessment

Hydrological and Hydrogeological Assessment

Figures and Photographs

Appendix A

Appendix B

Appendix C

Appendices D & E

Appendix 6 – Geotechnical Assessment

Geotechnical Assessment

Figures plus Appendices A & B

Appendix C

Appendices D & E

Appendix 7 – Mine Gas Risk Assessment

Appendix 7 – Mine Gas Risk Assessment

Appendix 8 – Air Quality Assessment

Appendix 8 – Air Quality Assessment

Appendix 9 – Noise Assessment

Appendix 9 – Noise Assessment

Appendix 10 -Lighting Assessment

Appendix 10 – Lighting Assessment

Appendix 11 – Vibration Assessment

Appendix 11 – Vibration Assessment

Appendix 12 – Transport Assessment

Appendix 12 – Transport Assessment

Appendix 13 – Soils & Agricultural Assessment

Soils and Agricultural Report

Highthorn Appendix 1 Soils and ALC Map

Highthorn Appendix 2 ALC for Individual Soil Profiles

Highthorn Appendix 3 New Drainage Conceptual Drawing

Appendix 14 – Draft Site Biodiversity Action Plan (BAP)

Appendix 14 – Draft site biodiversity action plan

Appendix 15 – Draft Environmental Management Plan (EMP)

Appendix 15 – Draft Environmental Management Plan

Appendix 16 – Discover Druridge

Appendix 16 – Discover Druridge

Discover Druridge Leaflet

Drawings

PA01 – Location Plan

PA02 – Site Boundary

PA03 – Site aerial

PA04 – Existing Features

PA05 – Geology

PA06 – Composite Working Method

PA07 – Phase 1 Working Method

PA08 – Phase 2 Working Method

PA09 – Phase 3 Working Method

PA10 – Phase 4 Working Method

PA11 – Phase 5 Working Method

PA12 – Restoration First

PA13 – Restoration Strategy

PA14 – Discover Druridge Masterplan

PA15 – Working Programme

PA16 – Compound Layout

PA17 – Haulage Route

PA18 – Surface water drainage

PA19 – Overburden Construction Phasing

PA20 – Public Rights of Way

PA21 – Cumulative Impact

PA22 – Planning Factors

PA23 – Services

PA24 – Access Details

For more information on Highthorn Surface Mine, click the links below.

Highthorn Surface Mine Parish Council Presentation 2013

Highthorn Surface Mine Local Residents Survey

Highthorn Surface Mine Scoping Report December 2014

Highthorn Surface Mine Exhibition Newsletter September 2015

Back to Project

Support this Project

Thank you for supporting our Downloads proposal. Please enter your details in the form below and let us know your reasons for supporting Downloads in the free text box below. Some examples are:

  • New much needed family homes for local people
  • Community improvements
  • New play areas
  • New footpaths and cycle-ways
  • Contribution to local education provision
  • Highways improvements to the local area
  • Improved drainage facilities

Get in touch

We welcome your feedback

Whether you wish to tell us that we have done something really well or that we could have done something better we value your feedback.

It helps us to shape the way we operate and to continually improve our performance. It is very much part of our development with care approach.

Registered office: Inkerman House, St John's Road, Meadowfield, Durham, DH7 8XL

Registered in England number 2267400. VAT registration number 569 3236 14

© 2017 Banks Group. All rights reserved.