When we develop a proposal we are always looking at how we can deliver the lowest cost green electricity in a sustainable way. Listen to Alan, our senior project manager, talking about what makes a ‘good’ design and what we do to take the design though to an operational project.

Alan talks about some of the most interesting elements of the Lethans Extension and why the project team are so excited to be working on it. He also explains why larger turbines are more effective and how they improve the performance of a project.

Why do we need large turbines?

The higher efficiency the turbine the more energy is generated, delivering lower household bills and larger benefits to the local community.

Tall turbines are able to capture less inhibited wind flows and higher wind speeds meaning the turbines can reach maximum output more often.  It also allows for a larger rotor diameter giving a larger power capture area again increasing the energy production.

With both of these combined it enables us to construct larger more powerful machines – which, on this site, allows us to reduce the number of turbines. This leads to a lower cost of energy to build and greater impact to the local economy.

How will we get the turbines to site? 

The turbine routes are still under review but expected to be delivered from King George V dock in Glasgow. From this location, the turbines are expected to travel down the M77 and then to the A76 through New Cumnock and arriving at the site through the consented Lethans WF route. The delivery of these turbines will be assessed and designed by an expert transport consultant to find the most efficient and safest route through any constrictive areas.

Ready to give feedback? Click here or explore more about the proposal- Visual considerations, Environmental considerations, How we work with the community.

Get in touch

We welcome your feedback

Whether you wish to tell us that we have done something really well or that we could have done something better we value your feedback.

It helps us to shape the way we operate and to continually improve our performance. It is very much part of our development with care approach.

Back to Project

Support this Project

Thank you for supporting our Designing Lethans Extension proposal. Please enter your details in the form below and let us know your reasons for supporting Designing Lethans Extension in the free text box below. Some examples are:

The information in this form will be emailed to the Banks Group and may be passed on to the relevant planning officer.

Registered office: Inkerman House, St John's Road, Meadowfield, Durham, DH7 8XL

Registered in England number 2267400. VAT registration number 569 3236 14

© 2021 Banks Group. All rights reserved.