Local Planning Authority: Stockton-on-Tees Borough Council
Postcode of nearby property: TS21 1JY
Site status: Operational. Construction was completed in late 2016
Number of turbines: 4
Tip height: 125m
Electricity generation capacity: Up to c2MW per turbine. Up to c8MW in total.
Lifetime of the wind farm: 25 years
Community engagement: A local liaison committee meets regularly so local residents can raise any issues with the operation and maintenance of the wind farm
History: Planning permission was granted by Stockton Borough Council’s planning committee on 7 December 2011. A liaison committee for the site was set up in February 2016 to allow information to be given to and from Banks and the local community. Construction of the wind farm began in March 2016 and the wind farm became fully operational early 2017

Get in touch

We welcome your feedback

Whether you wish to tell us that we have done something really well or that we could have done something better we value your feedback.

It helps us to shape the way we operate and to continually improve our performance. It is very much part of our development with care approach.

Registered office: Inkerman House, St John's Road, Meadowfield, Durham, DH7 8XL

Registered in England number 2267400. VAT registration number 569 3236 14

© 2018 Banks Group. All rights reserved.