0191 378 6100

Why Kype Muir Wind Farm?

WE’RE MOVING:

Banks Renewables is re-branding to OnPath Energy. We’re building our new website OnPathEnergy.com – take a sneak peek and sign up for updates.

Key reasons why Kype Muir was chosen as a suitable site for an on-shore wind farm:

  • On site wind monitoring over a three year period confirmed the site has a suitable wind resource.
  • The site and its immediate surroundings are not subject to any landscape, ecology or cultural heritage designations
  • The site has suitable access from the local road network
  • The site is located over two kilometres from the closes settlement
  • The site is an adequate distance from residential properties to protect residents from unacceptable noise and shadow flicker effects
  • The site is located in an area identified by South Lanarkshire Council as being suitable for wind farm development

Want to talk to us about any of our developments?
Contact us now on 0191 378 6100 or email us

Enquire Now

Fill in your details and a member from the team will be in contact with you shortly.

"*" indicates required fields